Southern Railways Announces Change in Pattern of Service Due to Pamban Bridge Maintenance Work

Indian Railways, Public Information, Southern Railways




Southern Railways Announces Change in Pattern of Service Due to Pamban Bridge Maintenance WorkSouthern Railways has announced change in pattern of service due to maintenance work o­n Pamban Bridge, traffic is temporarily suspended o­n Pamban Bridge, following which the changes in pattern of Train services are as follows.

  • Train No. 06851 Chennai Egmore – Rameswaram Special Train which left Chennai o­n 29.06.2021 and scheduled to reach Rameswaram at 08.30 hrs o­n 30.06.2021 was partially cancelled between Mandapam and Rameswaram and was terminated at Mandapam
  • Train No. 06852 Rameswaram –  Chennai Egmore Special Train of 30.06.2021 scheduled to leave Rameswaram at 17.10 hrs of 30.06.2021 is partially cancelled between Rameswaram and Mandapam and will leave Mandapam at the scheduled departure time of 17.40 hrs o­n 30.06.2021
  • Train No. 06849 Tiruchchirappalli – Rameswaram Special Train which left Tiruchchirappalli at 07.00 hrs o­n 30.06.2021 and scheduled to reach Rameswaram at 12.15 hrs is partially cancelled between Mandapam and Rameswaram and will be terminated at Mandapam
  • Train No. 06850 Rameswaram –  Tiruchchirappalli Special Train of 30.06.2021 scheduled to leave Rameswaram at 14.35 hrs of 30.06.2021 is partially cancelled between Rameswaram and Mandapam and will leave Mandapam at the scheduled departure time of 15.05 hrs o­n 30.06.2021




About the author: A Public Transport Enthusiast ! Writing About Namma TNSTC and SETC in this blog !! I am trying to connect with Travel Enthusiast using Public Transport as there regular choice of travel !!

0 comments… add one

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.